by SIM » Fri Apr 17, 2009 9:33 pm
In order to dense pack with cellulose the fill tube should be inserted up until it reaches the top of the stud cavity. In this example the home was balloon construction and we did not want cellulose to rise and fill the second story sidewall because additional electrical wires needed to be run down from the attic on the second floor. The second floor walls will be dense packed by drilling holes from the inside, as this unit is being remodeled.
StartInsulating Forum Moderator